A new septic tank should be installed only after a thorough site assessment, an appropriate system design, and any required approvals have been completed. Taking the time to plan properly helps ensure the system operates efficiently, complies with local regulations, and provides reliable wastewater treatment for many years.
Key Takeaways
- Every property requires a suitable septic system design.
- Council approval is often needed before installation begins.
- Soil conditions influence the type of system required.
- Professional installation helps avoid costly future problems.
- Regular maintenance protects the long-term performance of the system.
What a New Septic Tank System Actually Is?

A septic system is an onsite wastewater management system (OWMS) that treats and disperses all wastewater generated by a property not connected to the reticulated mains sewer network.
It consists of the underground tank, the inlet and outlet connections, and the absorption field into which clarified effluent is released for final treatment in the soil.
A full explanation of the components of a septic tank and how it processes wastewater covers the system’s function in detail for homeowners who are unfamiliar with how septic systems work before committing to one.
For properties that are on unsewered land on the Mornington Peninsula or in the surrounding region, a septic system is the standard wastewater solution where no mains sewer connection is available.
How to Get a New Septic Tank Installed: The Full Process?

The process of getting a new septic tank approved and installed in Victoria follows a defined sequence that must be completed in order.
The complete steps from first enquiry to finished installation are:
- Confirm mains sewer is not available: Before any septic work begins, confirm that reticulated sewer is genuinely unavailable from the property boundary. If sewer infrastructure is accessible, a connection is required rather than a new onsite system.
- Engage a licensed plumber or environmental consultant for a site assessment: The site’s soil type, slope, drainage characteristics, water table depth, and proximity to water sources, boundaries, and trees all need to be assessed before a system type or size can be specified.
- Commission a land capability assessment (LCA): The LCA is the formal assessment document that evaluates the site’s capacity to support an onsite wastewater system. It is required by most Victorian councils as part of the permit application for a new system.
- Select a system type based on the LCA findings: The LCA outcomes determine which type of system is appropriate for the site: a conventional tank and absorption field, an aerobic treatment unit (ATU), a sand filter system, or another configuration approved under the EPA’s framework.
- Apply to council for an A20 permit: The A20 permit is the regulatory permission required to construct, install, or alter an onsite wastewater management system in Victoria. The application is submitted to the local council, not directly to the EPA.
- Await permit approval: Council reviews the LCA, the proposed system design, and the site information before approving or conditioning the permit. Timeline varies by council but typically runs four to eight weeks.
- Licensed plumber installs the system: Once the permit is approved, a licensed plumber installs the tank, connects the inlet and outlet plumbing, and constructs the absorption field to the approved design.
- Inspection, sign-off, and registration: The completed system is inspected, compliance documentation is issued, and the system is registered with the council as an approved OWMS.
What Is Involved in Septic System Design?

Septic system design for a residential property on the Mornington Peninsula is not a one-size approach and the site characteristics are what determine which system type is appropriate, where it is positioned, and what size it needs to be.
The design process takes into account:
- Site topography: Slope and drainage direction determine where the absorption field can be positioned and what configuration works within the constraints of the lot.
- Soil permeability: Sandy soils absorb effluent quickly but may not provide the treatment time needed before liquid reaches groundwater. Heavier soils retain effluent longer but can saturate and surface if the field is undersized for the household load.
- Setback requirements: The system must be positioned at minimum distances from property boundaries, water sources including bores and drainage channels, trees, and the dwelling itself.
- Household capacity: The system size is calculated based on the number of bedrooms in the dwelling, which determines the daily wastewater load the system must handle.
- System type selection: Conventional tank and trench systems, ATU systems, and land application systems each have specific design requirements and siting conditions under the EPA framework.
Under Victoria’s Environment Protection Act 2017, an A20 permit from the local council is required to construct, install, or alter any onsite wastewater management system including new septic tanks, and the permit application must include the system design documentation prepared by a qualified practitioner.
How Soil Conditions on the Mornington Peninsula Affect Septic System Design?

Sandy coastal soils, which are common across significant parts of the lower Mornington Peninsula, behave differently from clay soils when receiving septic effluent, and the differences have a direct effect on what type of system can be installed and how the absorption field needs to be designed.
A detailed breakdown of how soil conditions across the Mornington Peninsula affect septic system performance and design covers the technical differences between the soil profiles found across the region and what each means for new system design, absorption field sizing, and long-term system viability.
In brief, sandy soils absorb effluent rapidly, which limits the biological treatment time available as the liquid moves through the soil profile toward groundwater.
This characteristic means absorption fields in sandy soil areas often need to be larger than the minimum size specified for clay soil sites, and in some cases a secondary treatment system such as an ATU is required before effluent can be dispersed to the soil.
Clay-heavy soils retain effluent longer, which improves treatment but increases the risk of the field saturating and effluent surfacing during periods of high household use or heavy rainfall.
Both soil profiles are present across different parts of the Peninsula, and the LCA process is specifically designed to identify which conditions apply to a given site and translate that into a system design that performs safely over the long term.
What Size Septic System Does a Mornington Peninsula Property Need?
Residential septic systems in Victoria are sized based on the number of bedrooms in the dwelling, because bedroom count is the accepted proxy for the number of occupants and therefore the daily wastewater volume the system must manage.
The standard sizing relationship used in Victorian system design and permitting is:
- 1 to 2 bedroom dwelling: A 2,000 to 3,000 litre tank capacity is typically the starting point, with an absorption field sized to match.
- 3 bedroom dwelling: A 3,000 to 4,500 litre tank is typically specified.
- 4 bedroom dwelling: A 4,500 to 6,000 litre tank or equivalent treatment unit depending on the system type selected.
The absorption field area required is calculated separately based on the soil permeability data from the LCA, the daily design flow for the household, and any setback requirements that constrain where the field can be positioned on the lot.
For properties with unusual site constraints, including small lot sizes, high water tables, or soil profiles that do not support conventional absorption, an environmental consultant specialising in onsite wastewater design is the right first step before engaging a plumber for the installation.
What the Installation Phase Actually Involves?

Once the A20 permit is approved and the system design is finalised, the physical installation by a licensed plumber follows a specific sequence.
How a septic system processes and disperses wastewater is useful context for understanding why each part of the installation sequence matters and what happens to the wastewater once the system is commissioned.
The physical installation steps are:
- Excavation: The tank location and absorption trench positions are excavated to the depths specified in the design, with particular care around setback distances and any underground services.
- Tank placement: The tank, typically concrete or polyethylene, is lowered into the excavation and positioned level to ensure inlet and outlet flow directions work correctly.
- Inlet and outlet plumbing: The inlet pipe connecting the household drainage to the tank is installed at the correct fall, and the outlet connection to the absorption field is positioned at the design invert level.
- Absorption field construction: The distribution pipe network, aggregate layer, and geotextile fabric are installed in the trenches to the design specification.
- Backfill: All excavations are backfilled and the site surface is reinstated.
- Inspection: The completed installation is inspected before it is commissioned and registered.
- Compliance certification: The licensed plumber issues the required compliance documentation on completion.
Ongoing Obligations After a Septic Tank Is Installed

Installing a new septic tank does not end the homeowner’s responsibility for the system.
Victorian law imposes ongoing obligations on the owners and occupiers of land with an onsite wastewater management system, and understanding those obligations before installing a system is part of making an informed decision about whether a new septic system is the right long-term solution.
The ongoing obligations include:
- Periodic pump-outs: The tank’s sludge layer must be pumped out every three to five years under normal conditions to prevent solids from entering and blocking the absorption field.
- System maintenance: Baffles, lids, and access points must be kept in serviceable condition. Damaged components must be repaired by a licensed plumber.
- Responsible use: Household practices affect system performance, including avoiding antibacterial products, non-biodegradable items, and excessive water loading that can disrupt the bacterial environment or overload the absorption field.
- Compliance with EPA requirements: The EPA’s guidelines for onsite wastewater management specify the ongoing management obligations that apply to all OWMS owners in Victoria, including requirements for operating the system within its design parameters and reporting any system failures.
- Pump-out records: Some councils require pump-out records to be maintained and provided on request.
These obligations continue for the full life of the system and are transferred to any subsequent owner when the property is sold.
Is a New Septic System the Right Choice or Should You Connect to Sewer?
For properties where reticulated sewer infrastructure has recently become accessible at the boundary, connecting to mains sewer is almost always the more practical and cost-effective long-term decision compared to installing a new onsite system.
A new septic system involves significant upfront cost, ongoing maintenance obligations, and the compliance and performance risks that all onsite systems carry over time.
A sewer connection involves a one-time installation cost and removes ongoing maintenance obligations permanently.
The decision is straightforward where sewer is accessible: connect.
For properties where sewer is genuinely unavailable, a new septic system is the required solution, and investing in a correctly designed and properly installed system from the outset is what determines whether the system performs reliably or creates ongoing problems.
Need Help with a New Septic System on the Mornington Peninsula?
DCG Plumbing provides a complete septic system installation service across the Mornington Peninsula, including site assessments, support with the permit process, full installation by licensed plumbers, compliance certification, and system registration.
We have direct experience with the soil conditions, council requirements, and EPA framework specific to the Peninsula, which means fewer delays and more reliable outcomes from the first consultation through to handover.
Call 0401 266 656 or get in touch through the website to discuss your property and arrange an initial site assessment.
Final Thoughts on New Septic Tank Installation
A new septic tank installation on the Mornington Peninsula is a significant project with regulatory, design, and installation requirements that need to be understood before any work begins.
The permit comes first.
The design follows the site assessment.
The installation follows the approved design.
And the homeowner’s obligations begin the moment the system is commissioned and do not end until the property either connects to mains sewer or the system is decommissioned.
Getting the site assessment, the LCA, and the system design right from the outset is what determines whether the installation performs as intended for its full design life or creates problems that are expensive to diagnose and address after the fact.